搜索答案

单选题 AT THE MAIN LANDING GEAR STATION, THE LOCATION FOR THE RAM AIR TURBINE (RAT) SAFETY DEVICE INSTALLATION IS ON THE:

A、 Right hand side of the A/C.
B、 Left hand side of the A/C.
C、 Center of the A/C.

微信扫一扫
扫一扫下载APP
微信小程序答题 下载APP答题
由4l***ds提供 分享 举报 纠错

相关试题

单选题 DMC 1 NORMALLY PROCESSES:

A、PFD 1, ND 1 and E/W displays.
B、PFD 1, ND 1 ,E/W displays and System/Status displays.
C、PFD 2, ND 2 and E/W displays.

单选题 A CLASS 3 FAILURE:

A、Affects the normal safe operation of the A/C and a corrective action must be performed in flight.
B、Does not affect the normal safe operation of the A/C but may affect its availability for the next flight.
C、Has no operational consequence for the safety or availability of the A/C and has no fixed time for correction.

单选题 ELECTROSTATIC ELECTRICITY IS BUILD UP BY:

A、Touching electrical circuits under tension.
B、Rubbing materials with each other or separating plastic sheets or tapes.
C、Moving metals over plastic surfaces.

单选题 EFIS AND ECAM DISPLAY UNITS (CRT'S) ARE:

A、Not interchangeable at all.
B、Electrically but not mechanically interchangeable.
C、Fully interchangeable.

单选题 ELECTROSTATIC DISCHARGE SENSITIVE EQUIPMENT ARE IDENTIFIED BY:

A、A circular red label.
B、An orange triangular label.
C、A black and yellow label.

单选题 IF ENGINE REVERSER COWLS HAVE BEEN OPENED FOR MAINTENANCE ACTION THE:

A、Slats must be retracted.
B、Flaps must be retracted.
C、Slats and flaps must be retracted.

单选题 AMONG THE FOLLOWING, THE STEP NOT APPLICABLE TO THE STORAGE PROCEDURE FOR LESS THAN 6 MONTHS, IS:

A、Protection of the fuel system.
B、Visual inspections of the oil system.
C、Protection of the doors.

单选题 IF BATTERY VOLTAGE IS BELOW 25 VOLTS, THE NECESSARY CHARGING CYCLE IS:

A、15 minutes.
B、20 minutes.
C、25 minutes.

APP信息