单选题 Newly installed and running pump ( ).

A、 The lubricating oil replacement cycle is the same as that of the normal running pump
B、 the lubricating oil replacement cycle is longer than the normal operation of the pump
C、 the lubricating oil replacement cycle is shorter than the normal operation of the pump
D、 replace multiple lubricating oil varieties

微信扫一扫
扫一扫下载APP
微信小程序答题 下载APP答题
由4l***ds提供 分享 举报 纠错

相关试题

单选题 When the height of the high work is ( ) m, it is called the level 2 high work.

A、 2 ~ 10
B、 5 to 10
C、 5 to 15
D、 10 to 15

单选题 For hot operation in the no-fire zone, the distance between the oxygen cylinder and the acetylene cylinder is at least ( ) meters.

A、 2
B、 3
C、 4
D、 5

单选题 ( ) Does not fall under fall protection.

A、 Safety belt
B、 Safety net
C、 hard hat
D、 Safety rope

单选题 For ( ) (including) above high work, the "high work permit" should be applied.

A、 10 m
B、 15 m
C、 20 m
D、 30 m

单选题 A gas explosiometer measures the ( ) of combustible gases.

A、 lower explosive limit
B、 Upper explosive limit
C、 explosion limit range
D、 mass concentration

单选题 When the chemical equipment is hot repair, the medium that can not be directly used to replace the combustible gas is ( ).

A、 helium
B、 Nitrogen
C、 Argon
D、 Air

单选题 When doing hot fire analysis, the interval between sampling and hot fire is more than ( ) minutes, or the stop time in the middle of hot work is more than ( ) minutes, you must resamb for analysis.

A、 30,30
B、 30,60
C、 60,30
D、 60,60

单选题 High work means work performed above the fall height datum ( ) (inclusive), where there is a possibility of falling.

A、 2 m
B、 2.5m
C、 3 m
D、 5 m