单选题 Is to start the oil cooling cycle phase work is ( ).

A、 at the bottom of each tower at the low point of the air cut water
B、 Heat up to 110-130 ℃
C、 equipment hot tight
D、 lead superheated steam to the top of the furnace to vent

微信扫一扫
扫一扫下载APP
微信小程序答题 下载APP答题
由4l***ds提供 分享 举报 纠错

相关试题

单选题 A gas explosiometer measures the ( ) of combustible gases.

A、 lower explosive limit
B、 Upper explosive limit
C、 explosion limit range
D、 mass concentration

单选题 When doing hot fire analysis, the interval between sampling and hot fire is more than ( ) minutes, or the stop time in the middle of hot work is more than ( ) minutes, you must resamb for analysis.

A、 30,30
B、 30,60
C、 60,30
D、 60,60

单选题 High work means work performed above the fall height datum ( ) (inclusive), where there is a possibility of falling.

A、 2 m
B、 2.5m
C、 3 m
D、 5 m

单选题 When the chemical equipment is hot repair, the medium that can not be directly used to replace the combustible gas is ( ).

A、 helium
B、 Nitrogen
C、 Argon
D、 Air

单选题 ( ) Does not fall under fall protection.

A、 Safety belt
B、 Safety net
C、 hard hat
D、 Safety rope

单选题 For ( ) (including) above high work, the "high work permit" should be applied.

A、 10 m
B、 15 m
C、 20 m
D、 30 m

单选题 For hot operation in the no-fire zone, the distance between the oxygen cylinder and the acetylene cylinder is at least ( ) meters.

A、 2
B、 3
C、 4
D、 5

单选题 When the height of the high work is ( ) m, it is called the level 2 high work.

A、 2 ~ 10
B、 5 to 10
C、 5 to 15
D、 10 to 15